Past Projects

The projects listed below represent a small fraction of the projects we have completed throughout the years.

DFW Midstream Services, LLC / Summit Midstream - August 2009 to June 2013

  • Natural gas gathering system located in the Dallas/Fort Worth metropolitan area
  • More than 125 miles of low and high- pressure pipelines with meter stations in the core of the Barnett shale
  • Currently has the largest producing  wells flowing through it

Frontier Gas Services, LLC  - January 2010 to May 2011

  • 16 miles of 10” high- pressure pipeline with capacity of 100 MMCF/d. Provided low pressure gathering service for gas produced from the Fayetteville Shale in Van Buren County, Arkansas.
  • Low pressure gathering lines, central compression, dehydration and amine treatment facilities and 5 miles of 8” high pressure pipeline with a capacity of 50 MMCF/d. Provided low pressure gathering and CO2 treating for gas produced from the Fayetteville Shale in Conway County, Arkansas.
  • 20 miles of low pressure gathering lines, central compression, dehydration and amine treatment facilities and 7 miles of 10” high pressure pipeline with an overall capacity of 60 MMCF/d. Provided low pressure gathering and CO2 treating for gas produced from the Fayetteville Shale in Faulkner County, Arkansas.
  • 14 miles of low pressure gathering lines, central compression, dehydration and amine treatment facilities and 6 miles of 10” high pressure pipeline with current compression capacity of 32 MMCF/d expandable to over 70 MMCF/d. Provided low pressure gathering, dehydration and CO2 treating for gas produced from the Fayetteville Shale in Faulkner County, Arkansas.
  • Low pressure gathering, central compression facilities and 3 miles of 8” high pressure pipeline with capacity of 60 MMCF/d. Provided low pressure gathering for gas produced from the Fayetteville Shale in White County, Arkansas. Gathering lines and compressor stations in Arkansas

Hilcorp Energy Company  - January 2011 to May 2012

  • Various pipelines in south Texas

Energy Transfer - On-going

  • Encroachment - rerouting, lowering  and upgrading of pipelines.

Energy Transfer

  • Dos Hermanas - 50 miles of 24" pipe in South Texas with a capacity of approximately 400 million cubic feet per day.  Originated in northwest Webb County, Texas, and extends to the Houston Pipeline rich gas gathering system in eastern Webb County, Texas.

LDH Energy

  • Rehab of LDH Energy's West Texas NGL Pipeline/pump stations that transports NGLs through a 1,066-mile intrastate pipeline system that originates in the Permian Basin in west Texas, passes through the Barnett Shale production area in north Texas and terminates at the Mont Belvieu storage and fractionation complex.

LDH Energy

  • Barnett Shale - 40 miles of 8" pipeline lateral (NGL) from Walnut Springs, TX. to Godley, TX.

Calpine Corp.

  • Baytown Project - installation of two pig launchers and a pig receiving station for two existing 20” gas pipelines that feeds the power plant in Baytown, Texas (Baytown Energy Center).

Copano - On-going

  • Eagle Ford Shale - gathering, compression, processing and fractionation services for its Eagle Ford Shale in DeWitt County, TX. Copano will gather gas into its recently completed 36-mile, 24-inch DK Pipeline in DeWitt and Karnes counties and will provide fully integrated services for both natural gas and natural gas liquids at its Houston Central Complex located in Colorado County, TX.
  • Meter Station - Reroute

Monroe Storage - Amory, Mississippi.

  • Construction of approximately 2.0 miles of gathering lines, installation of compression and related facilities /  Injection and recovery lines.
  • Construction of a 5.7mile pipeline interconnecting to the Texas Eastern Transmission Company pipeline in Monroe County, Mississippi, and a 17.2‐mile pipeline interconnecting to the Tennessee Gas Pipeline in Lamar County, Alabama.