The projects listed below represent a
small fraction of the projects we have completed throughout the years.
>>
Photos displayed may not
be from that specific project. << |
Freestone Pipeline Project
11.2 miles of 20 OD steel gas line
5.6 miles of 14 PVC water discharge line
Meter / regulator station, filter
separator, scrubber, storage tank, and inlet pipeline
Pig launcher and receivers
Directional drilling of the Trinity River |
Deer Park Energy Center
Two 20 OD gas pipelines, 6400 lineal
feet each
Meter / regulator station, filter
separator, scrubber, storage tank
Pig launchers at the meter site.
Pig receivers, regulation facilities,
filter separators, scrubbers, and storage tank at the Deer Park Site
Two Directional drills 1600 long each |
30 Bammel to Hempstead
Highway Line
12.7 miles of 30 gas pipeline
Meter / regulator station at each end.
Directional drills |
16 and 18 Tom OConnor to
Edna Line
Cleaned and Hydrostatic tested 40.8 miles
of 16 pipeline and 10.7 miles of 18 pipeline. |
Bammel Storage 20 Injection
and Recovery System
|
Bridgeport Compressor Station
and Pipeline
|
Kinder Morgan Compressor
Station #388
|
West Bammel Meter Skid, Main
Line Valve and Crossover Line
|
Retire 24 Houston West Loop
Line Piping
|
West Bammel 30 Meter Skid
and Regulator Station
|
Hempstead Highway, Katy
Satsuma 30 Main Line Valve, Tee, and Blow Down
|
Katy Meter and Regulator
Station
|
EOG/HPL Westfield 6 Pipeline
and Meter Station
|
Conroe to FM 1960 Line
Conversion to Natural Gas
|
Houston Pipe Line / Enron
16" Tom O'Conner Pipeline
cleaning and up-rating - Edna to Refugio, TX
|
Houston Pipe Line / Enron
16" Valley Pipeline cleaning
and up-rating - Alvin to Wadsworth, TX
|
Enron Midstream / Crestone
Energy Ventures
Coal Seam grass roots
gathering system - Gillette, WY
|
Calpine / AWGE - Baytown
Energy Center
3 miles of dual pipeline and
4 metering stations - Baytown, TX
|
Calpine - St. Gabriel Energy
Center
Pipeline and meter station
for power plant - St. Gabriel, LA
|
Tractebel / AWGE - Wise
County Power Plant
Install two 3500 VFD Electric
Drive Compressors and
associated equipment and
piping
|
Calpine
Installation of 12 miles of
12" pipeline in Rio Vista, CA
|
Calpine
Installaion of 8" pipeline in
Pittsburg, CA
|
Brazos Valley Power / AWGE
Installation of pipeline and
compressor station
for power plant in Jack
County, TX
|
|
|
 |